Sample monthly financial review
A worked example of what a $97 Monthly Financial Clarity Review contains: the priority to investigate, your business drivers, where the cash went, the supporting questions and answers, and three actions.
Everything below is invented. The business does not exist, the figures were made up to demonstrate the format, and none of it is a client result or a claim about what any review will find.
Sample review
What a review actually looks like
Harbor & Vine Catering (fictional), June 2026 compared with May 2026. The business, its figures and the owner’s answers are invented to show the format. This fictional catering example illustrates the review method. The service is available to US service businesses across industries.
1The one thing to focus on
Illustrative example — not a client resultRe-cost new wedding quotes before setting prices.
Wedding prices have not changed since January 2025. On the three largest June weddings, food and labor cost 61% of the price against 52% quoted. Weddings are now 57% of revenue, so wedding costing deserves priority; the sample does not establish the economics of every event.
+$2,918 in the model
Hypothetical 5% increase on June wedding revenue, assuming unchanged volume, mix and all costs. This is a sensitivity comparison, not a forecast or promised saving. Existing bookings remain unchanged.
Why this, and not something else
A 1% move in price is worth $1,024 a month, more than twice any other driver. Supplier and crew rates have risen and are largely outside the owner’s control. This makes pricing worth testing alongside current job costs; feasibility and customer response still matter.
- Prices up 1%+$1,024
- Food and beverage cost down 1%+$430
- Event volume up 1%+$379
- Overheads down 1%+$295
- Event labor cost down 1%+$215
Each sensitivity changes one input at a time. Price assumes unchanged volume and costs; volume assumes unchanged mix, spare capacity and direct costs varying with sales. Cost reductions are relative percentages, not percentage-point margin changes. These are comparisons, not forecasts.
The risk to manage
Confirmed bookings for July to September are $171,500, 12.5% lower than at this point last year. Apply new prices to new quotes only, and track the wedding win rate for two months.
2Your business drivers
Illustrative example — not a client resultRevenue
$102,400
▲ +10.8% vs May 2026
41 events delivered
Operating profit
$8,348
▼ −$786 vs May 2026
8.2% of revenue
Prime cost
63.0%
▲ +4.0 pts vs May 2026
Food, beverage and event labor
Cash less deposit balances
$18,700
▼ −$2,100 vs May 2026
Simple subtraction, not free cash or a runway forecast
| Driver | May 2026 | June 2026 | Change | What it means |
|---|---|---|---|---|
| Events delivered | 38 | 41 | +3 | More work, driven by weddings. |
| Average revenue per event | $2,432 | $2,498 | +$66 | Average revenue was broadly stable; mix can affect this average. |
| Gross profit per event | $997 | $924 | −$73 | Average gross profit per event fell; individual event results may differ. |
| Prime cost % of revenue | 59.0% | 63.0% | +4.0 pts | Costs rose; prices did not. |
| Modelled break-even revenue | $70,122 | $79,838 | +$9,716 | Modelled margin of safety is 22% of revenue, assuming current mix, variable direct costs and fixed overheads. |
| Confirmed bookings, next 90 days | $196,000* | $171,500 | −12.5% | Fewer bookings ahead. Watch this. |
| Receivables days proxy | 7 | 8 | +1 | Closing receivables / monthly revenue × days; assumes all-credit sales and even trading. Aging is needed to assess overdue debt. |
*Bookings compared with the same point last year.
3Where the cash went
Illustrative example — not a client resultCash fell $7,400 in a month with $8,348 of operating profit. This fictional bridge assumes no depreciation, interest, income tax or other unlisted movements. Cash less deposit balances is $18,700. Deposits relate to future delivery obligations; this subtraction is not available cash or cash runway. A forward receipts-and-payments forecast is needed.
| Operating profit | $8,348 |
|---|---|
| Customers owe more (two invoices, due July) | −$8,700 |
| Net decrease in customer deposit balances | −$5,300 |
| Other working capital | +$4,100 |
| Owner draws | −$3,500 |
| Equipment purchase | −$1,348 |
| Loan repaid | −$1,000 |
| Change in cash | −$7,400 |
4What we confirmed with you
Illustrative example — not a client resultBefore the final review, we ask about anything the figures cannot settle. Nothing in the review is guessed.
| Our question | Your answer | Confirmed by |
|---|---|---|
| When did wedding prices last change? | January 2025. | Owner |
| How did quoted cost compare with actual on the three largest June weddings? | Quoted 52% of price; actual 61%. | Owner, costing sheets |
| Have supplier and crew rates changed? | Yes. Both have risen this year. | Owner |
| Do any June food invoices belong to May events? | No. All relate to June events. | Bookkeeper |
| What makes up the cash movement not shown in the P&L? | Owner draws $3,500; equipment $1,348. | Bookkeeper |
| Is any money owed by customers overdue? | No. Two corporate invoices, due in July. | Receivables aging |
5What to do next
Illustrative example — not a client resultRe-cost new wedding quotes and test a 5% price scenario.
Result to look for: Every new quote uses current costs and an explicit contribution target. A 5% price rise alone takes a 61% cost ratio to 58.1%, not back to 52%. By July 17, 2026.
Track wedding quotes sent and won each week.
Result to look for: Compare win rate and expected contribution with the prior three months; adjust scope or pricing if the economics deteriorate. By Weekly from July 20.
Update the costing sheet with current supplier and crew rates.
Result to look for: Every quote built on current costs. By July 17, 2026.
A real review includes a written summary and short recorded walkthrough. Business drivers and cash reconciliation depend on the supporting records supplied. It is not an audit, an assurance engagement or a formal accountant’s review engagement.
Want this for your own month?
Send a short suitability enquiry. A delivery date is agreed with you before you pay.